A rear extension, from slab to kitchen
A single-storey rear extension: ground cleared, a reinforced slab, the blockwork shell, then the new kitchen inside.

An average extension takes 4 to 6 weeks, a larger one 6 to 8. You’ll know the expected finish date before work starts.
These four photos follow one extension from the cleared ground to the white kitchen with its island in the finished room.
Source: LR Building’s Which? Trusted Traders gallery.
The project
- Rear extension
- Renovations, refurbishments & extensions
The photos




Customers on projects like this
From Chimney Breast Removal to Full Refurb
“We first engaged LR Building to remove our chimney breast back in last May (2025) which was successfully done by Gary. On further talking to Lee, he was happy to take on refurbing our house (1950's semi) with us still living there! Work commenced at the beginning of October with Gary project managing and organising the various trades. By refurb, I mean refurb. We had a new remodelled bathroom, all walls replastered and painted, a total rewire with extra sockets in every room, new skirting boards, new internal doors, new spindles on the bannisters, knocking down the wall between the kitchen and the dining room, a new kitchen with a gas hob instead of an electric one, ceiling lights in some of the rooms, new radiators, all the party walls soundproofed with false walls, fitted wardrobes in 2 of the bedrooms, vinyl flooring laid on the whole ground floor and some French window doors added in the basement. Obviously there were cost overruns but Lee always came back quickly with new costings. There was also problems but thankfully Gary usually found a solution particularly when the sliding door wardrobes from Howdens came without instructions (Lee managed to get a small refund for us for that)! All-in-all my wife is happy and so am I. Gary has just finished (April) doing our garden fence which seems to have enough concrete poured into it to rebuild Hadrian's Wall. I don't think our fence will be falling over anytime soon...”
Customer in Greater London, chimney breast removal, then a full refurbishment of a 1950s semi · Which? Trusted Traders · 26 Apr 2026
Amazing work exceeded my expectations! Highly Recommend
“I couldn’t be happier with the results! I had a major flood in my apartment which completely destroyed the entire property and as a result I had to have all the wooden floors, skirting boards, doors, even door frames and carpets replaced as well as repaint the entire place just to mention a few things (it was a huge job). I am so incredibly happy with the result especially the painting and decorating as I am extremely particular when it comes to the finishings. I genuinely couldn’t be happier, my expectations have well and truly been exceeded! Ricky was managing the works on my apartment and he was so incredibly helpful always going above and beyond to help me with any questions I had and keep me informed which made the whole process way less stressful (even on weekends and responding to me in the evenings). My apartment looks incredible I’m so happy, it made the flood worth it ha! Thank you to all of the team who helped make my home so beautiful. Highly recommend I will definitely be in touch when I need anything in the future. Bianca”
Customer in Greater London, flat restored after a flood · Which? Trusted Traders · 6 Apr 2025
A red-brick house repointed, day by day →
The bay, side wall and street corner of a red-brick house, repointed over two and a half weeks in the autumn of 2015.
Get a quote
Describe the project and where it is. We’ll reply to arrange a visit, then send an itemised written quote.
- We reply within 2 working days
- We visit and look at the project properly
- You get an itemised, provisional quotation
Rather talk it through? Call or WhatsApp Lee on 07875 545032.
Photos help. Send them from the contact page or reply to our email with them.
Thanks, your enquiry is with us
We’ll reply within 2 working days.
