How we price and run a project
If it’s on the paperwork, we do it. If it’s not on the paperwork, we don’t. Nothing is lumped together, nothing is assumed, and every change is written down.
From first visit to final costing
A lot of building disputes start with one big price and a vague idea of what it includes. Ours are itemised from the start, so you can see exactly what you’re paying for.
“I particularly appreciated Lee confirming our agreed start date a few days beforehand, and the final invoice amount was the same as his quote, also nice!”
- The surveyWe come and look at the project with you and talk it through. No price on the doorstep: a building project deserves more thought than that.
- Provisional quotationBack at the desk we put everything on paper, itemised line by line with an estimated cost against each item. It’s provisional because it’s built on what we could see and what we discussed.
- RevisionsYou have time to think. Most people forget something on the day, or add things on the spot they don’t need. Take items out, add them, change them, and we issue a revised quotation, as many times as it takes.
- Final costingWhen it’s right, that’s the final costing and the scope of work. Everything on it, we do. Anything not on it, we don’t, unless you ask.
- On siteA project manager runs the project day to day. Building control, the engineer and any party wall matters are dealt with as agreed.
- CompletionThe work is checked, signed off where it needs to be, and the final payment is due.
What can’t be seen is written down
In an older house some things can’t be known until they’re opened up: under the floor, behind the plaster, the roof under the slates. After decades in the trade we know where the trouble usually hides, so the quotation flags those areas up front: “be aware of this”.
“including clearly warning the roof quotation could not be firm until scaffolding was up.”
Changes, in writing
Two kinds of change can happen once work starts. Both are put in writing and priced before we carry on.
You ask for something extra
Another two sockets, a doorway taken out, a different finish. We confirm it in writing with its cost, and the payment schedule is updated to match.
We find something hidden
Rotten joists under a floor, a lintel that isn’t there. We stop, show you, and send a written notice with the cost of putting it right. These works were not in the original quotation, and you decide.
“Obviously there were cost overruns but Lee always came back quickly with new costings.”
Paying for the work
No large deposit up front. You pay in stages as the work is done, against a schedule set out with your final costing: what each stage costs, what’s been paid, and the balance carried forward, down to the final payment on completion.
The schedule moves with the project. If a variation or unforeseen work changes the total, the payment schedule is reissued so you always know where you stand.
Professional services are separate. Engineer’s calculations, party wall agreements and building control submissions are invoiced as they’re ordered, and council fees are paid to the council.
Building control: you choose
Option A: we take control. We make the submission and call the building control inspector out at each stage until the work is signed off. You pay our service fee and the council’s fees.
Option B: you do it, we help. Some people prefer to give the building notice themselves. It’s straightforward, and we’ll point you to the forms and prompt you when an inspection is due. Booking the inspections is then your responsibility.
Building notice or full plans? · Engineer, party wall and building control
Get a quote
Describe the project and where it is. We’ll reply to arrange a visit, then send an itemised written quote.
- We reply within 2 working days
- We visit and look at the project properly
- You get an itemised, provisional quotation
Rather talk it through? Call or WhatsApp Lee on 07875 545032.
Photos help. Send them from the contact page or reply to our email with them.
Thanks, your enquiry is with us
We’ll reply within 2 working days.