In short
- Surveys on older houses nearly always list problems. Many are routine maintenance.
- Get the items priced by a builder before you exchange contracts, while you can still negotiate.
- Common findings include unsupported chimney breasts, high ground levels, worn pointing and old wiring.
- Our cost management report prices every item on your surveyor’s report, and the fee is refunded if we do the work.
Why it matters to act before exchange
In England and Wales you are not legally committed to buying until contracts are exchanged. Until then you can ask questions, get quotes, renegotiate the price or ask the seller to put things right. After exchange, the problems and their cost are yours.
A surveyor’s report tells you what is wrong but rarely what it will cost. Many recommend “further investigation by a specialist”. That is the gap to fill before you exchange.
Common problems surveys find in older houses
- Unsupported chimney breast: a breast removed below while the brickwork above was left without proper support.
- Raised external ground levels, bridging the damp-proof course and causing damp.
- Defective pointing, letting rain into the walls.
- Defective flashings around chimneys, parapets and roof junctions.
- Broken or leaking gutters and downpipes.
- Roof coverings near the end of their life: slipped or porous slates and tiles, worn flat roofs.
- Inadequate subfloor ventilation under suspended timber floors, from blocked or missing air bricks.
- Old wiring and heating systems that need checking by a qualified electrician or heating engineer.
Which ones to worry about
Anything structural comes first: an unsupported chimney breast, significant cracking, bulging walls, or structural work done without building control sign-off. These can affect safety, insurance and future sale, and usually need an engineer.
Water getting in is next: roofs, flashings, gutters, pointing and ground levels. Left alone these cause damp and rot. Many are not expensive to fix if dealt with early.
Some findings are standard wording. Surveys often recommend damp treatment on the strength of meter readings. On an older house, the cause is often outside the wall, so have it looked at before accepting a recommendation for injection.
Getting the survey priced
The difficulty is getting a builder round. Few will visit a house you do not own yet, arrange access through the estate agent, and price a long list for a project that may not go ahead.
That is what our cost management report is for. When you send us the surveyor’s report, we liaise with the estate agent to book the visit, inspect the house ourselves, and put a cost against every item on the report. If we find something the surveyor missed, we add it with a recommendation and a price. We also tell you what needs doing now and what can wait.
Buyers use the report to plan their budget and to negotiate the price with the seller. If you then give us the work, the fee is refunded.
Using the costs to negotiate
An itemised, costed list from a builder carries more weight with a seller than a general sense that the house needs work. You can ask for a reduction, for the seller to fix specific items before completion, or simply go ahead knowing the real cost.
If the numbers do not work, you have found out before you are committed.