Guide · Chimney breasts

Removing an upstairs chimney breast, or both floors

Bedroom chimney breasts are often the first to go, because the space matters more upstairs. The ground floor breast can stay, or both can come out. Each option needs a different kind of support.

A Victorian London terrace in yellow and red brick with bay windows and chimney stacks topped with rows of clay pots

In short

  • With the ground floor breast kept, the brickwork above the bedroom still needs support, usually in the loft or at bedroom ceiling level.
  • With both breasts removed, the loft section and stack are carried on steels in the loft, or the stack comes down.
  • Any concrete hearth in the bedroom floor comes out and the floor is rebuilt with new joists.
  • It needs building regulations approval, and party wall notice where the breast is on a party wall.

Removing the first floor breast and keeping the one downstairs

The ground floor breast can stay as it is and keep carrying its own load. The problem is what sits above the bedroom: the breast in the loft and the stack on the roof. Once the bedroom section is removed they need a new support, normally a steel beam at bedroom ceiling level or in the loft, bearing on the walls either side.

A structural engineer decides where the steel goes and how big it is. In a loft the steels often run across the ceiling joists and bear on the external and party walls, which keeps them out of sight.

Removing both the ground and first floor breasts

Taking out both floors gives the most space. Everything above, the loft section and the stack, is then carried on steels in the loft. The alternative is to take the stack down below the roofline as well, which removes the load altogether and means the roof has to be made good.

Which is right depends on the house. Some councils and conservation areas want stacks kept for the look of the street. Others are happy to see them go. Cost, the condition of the stack and your neighbour’s side all play a part.

The hearth and the bedroom floor

Upstairs fireplaces stand on a hearth, often a concrete slab built into the floor and carried by trimmer joists. When the breast is removed the hearth should come out too, and new timber joists are fitted and supported off the existing trimmers so the floor is level and strong.

The wall is then made good, and the skirting and floorboards matched across where the breast stood.

Things to check before you decide

  • Cross-over flues: in some houses flues run diagonally from one breast to another, and the breast cannot simply be removed. Building control guidance in some London boroughs warns of this where stacks are narrow, with the pots in a single line.
  • Your neighbour’s breast: if theirs has already been removed on the other side of the party wall, the support options narrow.
  • Gas appliances: any appliance using a flue in that wall needs a Gas Safe registered engineer’s check, in writing.
  • Leasehold flats and maisonettes: you will normally need the freeholder’s consent under your lease.

Approvals you need

Removing any part of a chimney breast is structural work under the building regulations. You will need an engineer’s calculations and drawing, a building control application, and inspections until the work is signed off. If the breast is on a party wall, the Party Wall etc. Act 1996 applies and notice must be served on your neighbour at least two months before work starts.

Questions

Can you remove a first floor chimney breast but not the ground floor one?

Yes. The ground floor breast stays as it is, and the brickwork above the bedroom is carried on new support, usually a steel beam designed by a structural engineer.

What happens to the loft section of the chimney?

It either stays and is carried on steels in the loft, or it is removed along with the stack and the roof is made good.

Get a quote

Describe the project and where it is. We’ll reply to arrange a visit, then send an itemised written quote.

  1. We reply within 2 working days
  2. We visit and look at the project properly
  3. You get an itemised, provisional quotation

Rather talk it through? Call or WhatsApp Lee on 07875 545032.

Photos help. Send them from the contact page or reply to our email with them.

What’s it about?

We reply to every enquiry within 2 working days. Your details are only used to reply about this project.

Enquiry sent

Thanks, that’s with LR Building

We reply to every enquiry within two working days.

Not heard back by then? Call or WhatsApp Lee on